Pioneer performed a PCA of a large commercial facility located in Northbrook, Illinois. The condition assessment was conducted in conjunction with a Phase I ESA to establish the total facility capital needs over the next 30 years. By analyzing the remaining useful life of various building components, the capital costs of maintaining the building were optimized in conjunction with an environmental remediation project at the subject building which provided an overall figure for expected property maintenance costs.
Case Studies
Site Assessment
- Brownfields Redevelopment – Closed Municipal Landfill
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Brownfields Redevelopment – UIC South Campus Redevelopment Project
- PCA – 100 year old 12-Story Building
- PCA – Commercial Office Building
- PCA – Hotel
- PCA – Industrial Facility
- Phase I ESA – Active Steel/Forging Plant – Louisville, KY
- Phase I ESA – Historical Landfill Site – Upstate New York
- Phase I ESA – Internet Campus Redevelopment
Remediation
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- In-Situ Chemical Oxidation – Chlorinated Solvents at a Commercial Dry Cleaner
- In-Situ Chemical Oxidation – Heating Oil Release
- PCB Remediation Project – Chicago
- Regulatory Closure – Former Retail Gasoline Stations
- Remediation – CTA Bus Garage Redevelopment Project
- Remediation – Former Chemical Storage Drum Reconditioning Plant
- Remediation – Former Industrial Facility
- Remediation – Former Steel Manufacturing Plant
- Remediation – Historical Scrap Metal Facility
Geotech+Construction
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Geotechnical Investigation – Former CHA Redevelopment
- Geotechnical Investigation – Proposed 5-story Building, Chicago
- Geotechnical Investigation – Proposed High-Rise Building, Chicago, IL
- Geotechnical Investigation – Warehouse Facility, Chicago, IL
- Phase I ESA – Dam Inspection & Evaluation for Dam Safety Permit, Cortland, IL