Pioneer performed a PCA of a 5-story hotel constructed in three phases starting in the 1970s. The assessment included an evaluation of all the HVAC components for the common areas, banquet rooms, kitchens, and guest rooms. Additionally, the property contained a pool, work out area, sauna, and numerous passenger and freight elevators that were all evaluated. Issues associated with the Americans with Disability Act were identified and costs associated with their repairs were included in the 12-year cost estimate.
Case Studies
Site Assessment
- Brownfields Redevelopment – Closed Municipal Landfill
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Brownfields Redevelopment – UIC South Campus Redevelopment Project
- PCA – 100 year old 12-Story Building
- PCA – Commercial Office Building
- PCA – Hotel
- PCA – Industrial Facility
- Phase I ESA – Active Steel/Forging Plant – Louisville, KY
- Phase I ESA – Historical Landfill Site – Upstate New York
- Phase I ESA – Internet Campus Redevelopment
Remediation
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- In-Situ Chemical Oxidation – Chlorinated Solvents at a Commercial Dry Cleaner
- In-Situ Chemical Oxidation – Heating Oil Release
- PCB Remediation Project – Chicago
- Regulatory Closure – Former Retail Gasoline Stations
- Remediation – CTA Bus Garage Redevelopment Project
- Remediation – Former Chemical Storage Drum Reconditioning Plant
- Remediation – Former Industrial Facility
- Remediation – Former Steel Manufacturing Plant
- Remediation – Historical Scrap Metal Facility
Geotech+Construction
- Brownfields Redevelopment – Former Petroleum Distributor & Chemical Facility
- Geotechnical Investigation – Former CHA Redevelopment
- Geotechnical Investigation – Proposed 5-story Building, Chicago
- Geotechnical Investigation – Proposed High-Rise Building, Chicago, IL
- Geotechnical Investigation – Warehouse Facility, Chicago, IL
- Phase I ESA – Dam Inspection & Evaluation for Dam Safety Permit, Cortland, IL